Minister Danail Papazov inspects the construction of the railway line Dimitrovgrad – Svilengrad-the Greek border

Minister Danail Papazov inspects the construction of the railway line Dimitrovgrad – Svilengrad-the Greek border

km 232+760 - View to installed turnouts 19, 21, 23, 25, 27, 29, 31, 33 and 35

km 232+760 - View to installed turnouts 19, 21, 23, 25, 27, 29, 31, 33 and 35

Dimitrovgrad Station New Platforms - installation of new track at km 231+560 to km 234+290

Dimitrovgrad Station New Platforms - installation of new track at km 231+560 to km 234+290

Demolition of Existing Road Overpass at km 231+ 888

Demolition of Existing Road Overpass at km 231+ 888

Culvert at km 281+500

Culvert at km 281+500

Ballast laying at km 296+100

Ballast laying at km 296+100

Railway Bridge at km 284+720

Railway Bridge at km 284+720

Asphalt laying at Road Overpass at 294+976, Siva reka

Asphalt laying at Road Overpass at 294+976, Siva reka

New Road Overpass in Generalovo at km 309+544

New Road Overpass in Generalovo at km 309+544

New Maritsa River Railway Bridge at km 301+600

New Maritsa River Railway Bridge at km 301+600

Erected GSM-R tower in Dimitrovgrad Station

Erected GSM-R tower in Dimitrovgrad Station

174,6 km/h reached upon the Phase 3 speed testing on 11.12.2012

174,6 km/h reached upon the Phase 3 speed testing on 11.12.2012

Maritsa River Railway Bridge at km 301+600

Maritsa River Railway Bridge at km 301+600

Phase 3 Noise Protection Barrier km 313+700

Phase 3 Noise Protection Barrier km 313+700

Emergency Exit at km 313+600

Emergency Exit at km 313+600

Commemorative Plaque - Plovdiv CTC Building

Commemorative Plaque - Plovdiv CTC Building

from the EC visit on 27 January 2012

from the EC visit on 27 January 2012

Signal Cable Terminals

Signal Cable Terminals

Parvomai Battery Room

Parvomai Battery Room

Parvomai ETCS balises

Parvomai ETCS balises

GSM-R Antennae - Macedoniq blvd., Plovdiv

GSM-R Antennae - Macedoniq blvd., Plovdiv

Dispatcher communication center

Dispatcher communication center

Dispatcher Workstation

Dispatcher Workstation

Automatic Train Route Setting

Automatic Train Route Setting

Stalevo Halt F-O

Stalevo Halt F-O

OHL LCP showing 3 pos 5 mode switch

OHL LCP showing 3 pos 5 mode switch

Krumovo Substation

Krumovo Substation

Stalevo Platform

Stalevo Platform

Systems Power Dispatchers - SCADA

Systems Power Dispatchers - SCADA

Chaya River Bridge & Road Overpass Katunitsa

Chaya River Bridge & Road Overpass Katunitsa

km 201+000

km 201+000

Traction Power Substation Krumovo

Traction Power Substation Krumovo

Vinitsa Halt & Road Overpass

Vinitsa Halt & Road Overpass

Yabalkovo Station

Yabalkovo Station

Krum Halt

Krum Halt

Track laying at km 312+100

Track laying at km 312+100

Flash-butt welding at km 312+350

Flash-butt welding at km 312+350

Reinforcement implementation for pier 2 RB Maritsa river at km 301+600

Reinforcement implementation for pier 2 RB Maritsa river at km 301+600

Installation of water pool at km 206+783

Installation of water pool at km 206+783

Embankment with frost protection layer, km 224

Embankment with frost protection layer, km 224

Deck waterproofing of Road Overpass at km 224+271

Deck waterproofing of Road Overpass at km 224+271

Execution of track leveling works at km 215+600

Execution of track leveling works at km 215+600

Kochovo Halt

Kochovo Halt

Km 170+900

Km 170+900

TPSS Krumovo

TPSS Krumovo

TPSS Krumovo - Building

TPSS Krumovo - Building

Turtle Passage at km 204+520

Turtle Passage at km 204+520

Turnouts Heating Device

Turnouts Heating Device

Vinitsa Halt and Rоad Overpass

Vinitsa Halt and Rоad Overpass

Chaya River Bridge

Chaya River Bridge

Works at km 224+200 – Krum Village Overpass

Works at km 224+200 – Krum Village Overpass

Traction Power Substation Parvomai

Traction Power Substation Parvomai

Dismantling of the old Chaya River Bridge

Dismantling of the old Chaya River Bridge

Testing of Road Overpass Cheshnegirovo

Testing of Road Overpass Cheshnegirovo

Execution of embankment at km 311+500

Execution of embankment at km 311+500

Pile casting– RB over Maritsa river at km 301+600

Pile casting– RB over Maritsa river at km 301+600

Reinforcement installation for culvert at km 308+533

Reinforcement installation for culvert at km 308+533

First ballast layer on Railway Bridge at km 213+795

First ballast layer on Railway Bridge at km 213+795

Installation of Turnouts Nos. 2, 4 & 6 - Western Side

Installation of Turnouts Nos. 2, 4 & 6 - Western Side

Railway Track km 201+200

Railway Track km 201+200

Road Overpass Parvomai 1 North

Road Overpass Parvomai 1 North

Overview km 192+000

Overview km 192+000

Fly-over km 206+485 – humus on road approach embankment

Fly-over km 206+485 – humus on road approach embankment

Cheshnegirovo Halt and Road Overpass Cheshnegirovo 1

Cheshnegirovo Halt and Road Overpass Cheshnegirovo 1

Installations of Catenary on the hard spans collar beams

Installations of Catenary on the hard spans collar beams

Sadovo Station - Platforms and Noise Protection Barrier

Sadovo Station - Platforms and Noise Protection Barrier

Parvomai Road Overpass

Parvomai Road Overpass

Vinitsa Road Overpass

Vinitsa Road Overpass

Railway Track and Catenary Poles on Phase 1 Site

Railway Track and Catenary Poles on Phase 1 Site

Katunitsa Station - Noise Protection Barrier

Katunitsa Station - Noise Protection Barrier

Katunitsa Station

Katunitsa Station

Sadovo Station

Sadovo Station

Railway bridge beams concreting at km  203+750

Railway bridge beams concreting at km 203+750

Temporary Level Crossing at km 204+900

Temporary Level Crossing at km 204+900

Railway Track at km 207+000

Railway Track at km 207+000

Km 209+005 Box Bridge

Km 209+005 Box Bridge

Km 206+161 View towards Kirkilitsite Overpass

Km 206+161 View towards Kirkilitsite Overpass

Km 185+546 - Popovitsa Station

Km 185+546 - Popovitsa Station

Km 184+487 Railway Bridge Cherkezitsa

Km 184+487 Railway Bridge Cherkezitsa

Km 196+200 - Cast in-situ diches

Km 196+200 - Cast in-situ diches

Km 182+037  Road Overpass Cheshnigirovo 2

Km 182+037 Road Overpass Cheshnigirovo 2

Km 175+117 Sadovo Station

Km 175+117 Sadovo Station

Km 174+296 Casting of Concrete at Road Overpass Sadovo

Km 174+296 Casting of Concrete at Road Overpass Sadovo

Km 174+296 Reinforcement Works at Road Overpass Sadovo

Km 174+296 Reinforcement Works at Road Overpass Sadovo

Frost Protection Layer at km 202+350

Frost Protection Layer at km 202+350

Pre-cast Beams for Rail Bridge at km 208+785

Pre-cast Beams for Rail Bridge at km 208+785

Road Overpass Cheshnigirovo at km 178+692

Road Overpass Cheshnigirovo at km 178+692

Culvert at km 206+161

Culvert at km 206+161

Flush Butt Welding

Flush Butt Welding

Railway Track Installation at km 177+000 to 178+000

Railway Track Installation at km 177+000 to 178+000

Scaffolding and Reinforcement Works on Debar Railway Bridge at km 196+703

Scaffolding and Reinforcement Works on Debar Railway Bridge at km 196+703

Installation of bridge beams at km 196+703

Installation of bridge beams at km 196+703

Alumino-thermic Welding at km 171+550

Alumino-thermic Welding at km 171+550

Temporary Turnout at approx. km 169+150

Temporary Turnout at approx. km 169+150

Preparation for Destressing at km 172+750

Preparation for Destressing at km 172+750

Trackworks in the open track 1 and 2 Katunitsa-Sadovo

Trackworks in the open track 1 and 2 Katunitsa-Sadovo

Excavation works at km 195+700 near Parvomai

Excavation works at km 195+700 near Parvomai

Construction of frost protection layer at km 174+400

Construction of frost protection layer at km 174+400

Site Inspection of the Phase 1 section by Minister Mutafchiev on 9 July 2008

Site Inspection of the Phase 1 section by Minister Mutafchiev on 9 July 2008

Reinforcement for foundation  of road overpass at km 167+914

Reinforcement for foundation of road overpass at km 167+914

Mobile electric flash-butt welding machine

Mobile electric flash-butt welding machine

Mobile crusher for ballast production

Mobile crusher for ballast production

Mobile crusher for ballast production

Shaping of cutting slope at km 181+500

Shaping of cutting slope at km 181+500

Construction of subgrade at km 180+400

Construction of subgrade at km 180+400

Topsoil removal at km 197+800

Topsoil removal at km 197+800

Construction of high embankment  196+700

Construction of high embankment 196+700

employer

beneficiary

Engineering Supervisor

Phase 1 & 4.1 Contractor

Phase 2 Contractor

Phase 3 Contractor

Phase 4.2 Contractor

Phase 4.3 Contractor

Systems Contractor

long-term technical assistance